top of page

Projects

The MLK Gateway Project

(1909 - 1913 Martin Luther King, Jr. Avenue SE and 1201 - 1215 Good Hope Road SE)

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

Images courtesy of Menkiti Group, Charles Wilson, and Google Street View

The MLK Gateway Project, located at a main entry point into the Anacostia Historic District from the 11th Street Bridge, will feature offices, a creative workspace, and much-needed retail. The development is also intended to serve as an anchor for a DC-based technology company.

​

HAPS worked successfully with the MLK Gateway Partners in developing a design for the Project that is compatible and complementary to the existing structures and the character of the Anacostia Historic District.

 

This included creating a design that was inspired by the facade of the 1909 MLK location, which collapsed in 2015, which was later approved by the Historic Preservation Review Board. The resulting design provides a fresh perspective on the positive impact of preservation coexisting with new development.

bottom of page